Ageing & conformal coating coordination
Plan board protection and ageing requirements around the operating environment.

Images from company materials. Illustrative applications; availability and specifications are confirmed for each project.
Scope & application
JKR lists ageing and coating among its manufacturing services. Define whether the objective is screening, reliability validation or surface protection, then agree temperature, load, duration and inspection methods. For conformal coating, identify connectors, test points and keep-out areas, and specify materials, curing and rework requirements.
Before we begin
Prepare the application, indicative quantities, target schedule and available documentation to establish the scope and next steps.
Clarity at every step.
Design & PCB
Define functions, circuitry, board layout and mechanical interfaces before sampling.
BOM & materials
Review part numbers, availability and substitution rules; coordinate PCB fabrication and sourcing.
SMT & DIP
Connect surface-mount, through-hole and soldering processes with board-specific inspection requirements.
Test & delivery
Plan functional testing, ageing, conformal coating, final assembly and outgoing checks as required.
↗
↗